Why does gross margin per job look wrong right after the job closes?
Because costs arrive later than revenue. Labor posts when timesheets are approved, materials post when purchase orders are received and reconciled, and subcontractor invoices can lag by weeks. A job looks highly profitable on completion day and its margin drifts down as real costs attach. Any margin report on recent work is provisional until the cost side has settled.
Revenue is fast, cost is slow
Revenue attaches to a job the moment an invoice is created, which is often the same day. Cost attaches through several independent processes that each have their own human step. Payroll approval happens weekly. Purchase order receipts happen when someone reconciles the truck stock or the supply house invoice. Subcontractor bills arrive on the sub's schedule, not yours.
The result is a systematic optimism in recent margin numbers. It is not an error in the software; it is the shape of the underlying business process.
How to tell settled from unsettled
Measure your own cost settlement curve. For a sample of completed jobs, record total attached cost at day one, day seven, day thirty and day sixty after completion. The point where the curve flattens is your settlement horizon, and it is usually different for install work than for service work because material intensity differs.
Once you know it, put a rule on the report: margin for jobs completed inside the settlement horizon is labeled provisional. That single label prevents a lot of bad decisions made on the strength of a great-looking week.
The costs that never attach at all
- Unbilled return visits. A callback done at no charge consumes labor that often gets coded to the new job rather than the original one, which flatters the original job's margin permanently.
- Windshield time. Drive time between jobs is real cost that is rarely allocated to a specific job, so dense routes and sparse routes look identically profitable.
- Warranty parts. Replaced under warranty means no revenue, but the labor and truck cost were real.
- Overhead allocation. Whether dispatch, office and marketing cost is loaded onto the job changes whether you are reading gross margin or something closer to contribution.
What to do with the number once it settles
Settled margin by job category is one of the highest-value cuts in the entire dataset, because it frequently contradicts intuition about which work is worth chasing. High-ticket work with heavy material content can contribute less than smaller, denser service work once drive time and callbacks are honest.
Feeding that back into marketing is the point: bidding harder on demand that produces low-margin work is a common and expensive mistake. Connecting settled job economics to channel performance is what we mean by revenue intelligence, and it depends on a clean feed from the field service system rather than a screenshot of a report.
Topics: job costing · margin · operations · finance