How long should the revenue attribution window be?
Long enough to capture most of the revenue a lead eventually produces, short enough to still make decisions with. Derive it from your own lag data: measure days from first contact to completed revenue, plot the cumulative curve, and set the window where it flattens. Emergency work resolves in days. Replacement and project work can take weeks or months. A single window across all job types will misjudge the slow ones badly.
The window is a business measurement, not a platform setting
Ad platforms ship default conversion windows chosen for their own optimization needs. Those defaults have nothing to do with how long your customers take to become revenue. Adopting them means your revenue reporting inherits an arbitrary cutoff.
The correct window comes from your data. Take completed jobs over a long historical period, compute days between the first attributable contact and the completion, and build the cumulative distribution. Where that curve flattens is where an additional week of waiting stops changing the answer.
Do the same exercise for calls and for form submissions separately. Phone-led demand and form-led demand rarely mature on the same schedule, and averaging them produces a window that fits neither. If the two curves are close, collapse them; if they are not, keep them apart and say why on the report.
Different work types need different windows
A no-heat call in January books the same day and completes within days. A full system replacement involves quotes, financing, a spouse and possibly a roof. Averaging those two into one window makes emergency channels look complete and planned-work channels look weak, permanently.
If you must publish one number, publish it per job type as well. The per-type view is where the actual insight lives, and it usually reveals that the channels people were about to cut are the ones feeding slow, large work.
Reporting a period that has not finished maturing
- Label maturity. Show what share of the period's expected revenue has landed so far, not just the raw total.
- Compare at equal age. Put this month's thirty-day revenue next to last month's thirty-day revenue rather than last month's final figure.
- Forecast the tail separately. If you extrapolate using the maturation curve, mark it as a projection on the report itself.
- Never restate silently. When a closed period's number changes because late revenue arrived, say so; unexplained restatements are how reporting loses credibility.
The tradeoff you cannot escape
A short window gives fast, actionable, incomplete answers. A long window gives complete, slow, sometimes irrelevant answers. Both are legitimate; running only one is the mistake.
In practice, most operators want a short window for weekly pacing and a long one for quarterly allocation. Building both from the same reconciled data set, rather than from two different tools, is what keeps them consistent. That reconciliation is the unglamorous middle of any data integration project, and it is why revenue intelligence starts with definitions rather than with charts.
Topics: attribution window · lag · reporting · job type · measurement
Have a version of this question about your own business?
The useful answer usually depends on which systems you run and how they're connected. That's a conversation, not a blog post.